Installation
Of Gas Transmission Pipeline
|
|
| |

1)
The steel gas pipe is lowered into the trench.
|
|
| |

2)
Aligning and fitting up the steel gas pipe for welding.
|
|
| |

3)
Welding of the steel gas pipe, which is followed by
an x-ray
to ensure that welding is done correctly.
|
|
| |

4)
Grinding is carried out to smoothen the steel gas
pipe's surface.
|
|
| |

5)
Sand blasting to clear the pipe's surface before coating.
|
|
| |

6)
Preheating before coating of epoxy primer.
|
|
| |

7)
Application of epoxy primer.
|
|
| |

8)
Wrapping of heat shrink sleeves for corrosion protection
of the joint.
|
|
| |

9)
Peel test is conducted to ensure that the heat shrink
sleeves adheres tightly to the steel gas pipe.
|
|
| |

10)
Backfilling the trench with quarry dust to protect
the steel gas pipe.
|
|
| |

11)
Installation of concrete top slabs.
|
|
| |

12)
Reinstating the road surface after completion of pipe
installation works.
|
|
| |
|
|